Skip to main content
Concept

Orthomosaic

A single, seamless, geometrically corrected map created by stitching together many overlapping drone photos, with the correction process, called orthorectification, removing the distortion caused by camera angle and terrain so the result can actually be measured accurately rather than just viewed as a picture.

Why it matters

A regular photo distorts distances and angles depending on the camera's angle and the terrain's elevation changes, which makes it useless for actually measuring anything on it. Orthorectification is what turns a stitched set of drone photos from a nice-looking picture into a surveying-grade map someone can take real measurements from.

On a real project

A drone operator captures hundreds of overlapping photos of a construction site and processes them into a single orthomosaic, geometrically corrected against ground control points, giving the project team a map accurate enough to measure real distances and areas directly from it.

Who this matters most to

A Drone/UAV Specialist captures the raw photos and processes them into a finished orthomosaic, while a GIS Specialist often works with the resulting geospatial data afterward.

Where this goes wrong

A team treats a quickly stitched set of drone photos as measurement-accurate without it ever having been properly orthorectified against ground control points. Distances pulled from that unprocessed image end up noticeably off from reality, since the raw stitched photo was never actually geometrically corrected.