Skip to main content

Careers

114 careers across 8 categories, from the jobsite to the office to the insurance side of the industry. Search by name, jump to a letter, or browse by category.

Entry Level

Carpenter

Builds the wood and metal framing that gives a structure its shape, and the finish work that makes it look done.

Entry Level

Concrete Worker (Cement Mason / Finisher)

Places, shapes, and finishes concrete before it sets, a narrow window to get a permanent, highly visible surface exactly right.

Entry Level

Drywall Installer & Finisher (Taper)

Hangs and finishes the walls and ceilings of almost every interior space, the trade that turns a framed structure into rooms.

Entry Level

Electrician

Installs and wires the systems that bring power, light, and data into a building, and keeps them from becoming a fire hazard.

Entry Level

Elevator & Escalator Technician

Installs, maintains, and repairs the elevators and escalators that move people and freight through a building, one of the highest-paid trades most newcomers have never heard of.

Entry Level

Equipment Operator

Runs the excavators, bulldozers, and cranes that move earth and materials, and for cranes specifically, has to hold a real federal certification to do it legally.

Entry Level

Flooring Installer

Installs the finished floor a building is walked on every day, from resilient sheet goods to carpet to engineered wood, where a small subfloor problem becomes a visible, expensive failure.

Entry Level

Glazier

Installs the glass, curtain wall, and storefront systems that give a building its skin, precision work where a fraction of an inch off is the difference between a weathertight seal and a leak.

Entry Level

HVAC Technician

Installs and services the heating, cooling, and ventilation systems that keep a building livable, one of the few trades with a federal certification requirement baked into the job.

Entry Level

Insulation Installer

Installs the material that keeps a building's heating and cooling bills in check, hidden work that's nearly impossible to fix once walls and ceilings close over it.

Entry Level

Ironworker

Erects the structural steel skeleton a building hangs from, often working at height on beams before any floor or safety net exists below.

Entry Level

Construction Laborer

The most common way into the entire industry, no prior experience required, and a front-row seat to every trade before choosing which one to specialize in.

Entry Level

Mason

Builds with brick, block, and stone, work that's visible on the finished building in a way most structural trades aren't.

Entry Level

Millwright

Installs, aligns, and maintains the heavy industrial machinery inside a facility, an entry point into manufacturing and industrial construction most newcomers never hear about.

Entry Level

Painter

Applies the finish coat that's the most visible part of almost every building, and, on older buildings, has to know exactly what's under that old paint before touching it.

Entry Level

Pipefitter / Steamfitter

Installs and welds the high-pressure and process piping systems that move steam, chemicals, and fluids through commercial and industrial buildings, a distinct trade and apprenticeship from residential plumbing.

Entry Level

Plasterer / Stucco Mason

Applies plaster, cement, and stucco finishes to interior and exterior walls and ceilings, a hand-skill trade distinct from bricklaying or block work.

Entry Level

Plumber

Installs and maintains the pipes and fixtures that bring in clean water and carry waste out, work that has to be right the first time, since most of it disappears behind a wall.

Entry Level

Roofer

Installs and repairs the one system every building depends on to keep water out, physically demanding work done almost entirely outdoors, at height.

Entry Level

Sheet Metal Worker

Fabricates and installs the ductwork, flashing, and metal roofing systems that move air through a building and keep water out of it.

Entry Level

Solar PV Installer

Installs the rooftop and ground-mount solar panel systems behind the fastest-growing segment of the construction trades.

Entry Level

Sprinkler Fitter

Installs and tests fire sprinkler systems, a piping specialty with its own union, apprenticeship, and certification track separate from plumbing or HVAC pipefitting.

Entry Level

Tile Setter

Installs tile and stone to tight layout and leveling tolerances, finish work where an uneven line or bad grout joint is visible to everyone who walks through the room.

Entry Level

Waterproofing Installer

Installs below-grade and plaza waterproofing membranes before the work is buried or built over, a specialty of the roofing trade where mistakes are essentially impossible to fix once they're covered.

Entry Level

Welder

Joins metal components with heat and pressure, and for structural work, has to prove it on a certification test before being allowed to do it on a real building.

Assistant Project Manager

The step between Project Engineer and Project Manager, carrying real ownership of pieces of the budget and schedule instead of just documenting them.

Assistant Superintendent

Runs the field alongside the Superintendent, the natural next step for someone who wants to manage a jobsite rather than move into the office.

Entry Level

Document Control Specialist

Owns the submittal logs, RFI logs, and drawing revisions that keep everyone on a project working from the same current information, a real entry point into the office side of construction.

Entry Level

Field Engineer

The entry-level engineering role on the field side rather than the office side, doing layout, surveying support, and daily documentation for a Superintendent instead of submittals and RFIs for a Project Manager.

General Superintendent

Oversees the field side of every active project a company has running at once, the superintendent track's own senior leadership step, named in this site's Superintendent and Assistant Superintendent pages without ever getting its own page.

Entry Level

Project Engineer

The project management team's problem-solver and paperwork owner, the entry point into a Project Manager career for most people who don't come up through the trades.

Project Manager

Runs the business side of a construction project so the people building it can focus on building it.

QA/QC Inspector

Physically inspects and tests completed work against the specifications, the hands-on counterpart to a Quality Control Manager's oversight role.

Quality Control Manager

Makes sure the finished work actually matches the contract specifications, the counterpart to a Safety Manager, protecting the project instead of the people.

Entry Level

Safety Coordinator

A genuinely common entry point into construction safety, doing the daily hands-on safety work a Safety Manager doesn't have time for, without yet needing the certifications or years of experience the Safety Manager role requires.

Safety Manager

Owns the jobsite's safety program, training, inspections, and incident tracking, on projects large enough to need a dedicated safety role beyond what the superintendent handles day to day.

Scheduler

Builds and maintains the project schedule everyone else's work depends on, the person who can tell you exactly what happens if today's delay ripples forward.

Senior Project Manager

Runs the biggest, most complex projects and mentors the Project Managers underneath them, a title this site's own Project Manager, Project Engineer, and Assistant Project Manager pages all pointed toward without ever backing it.

Superintendent

Runs the jobsite day-to-day so the schedule, the safety, and the actual sequence of work all hold together.

Entry Level

Bid Coordinator

Manages the logistics of getting a bid out the door on time, a realistic first job for someone interested in estimating who isn't ready to price a project yet.

Chief Estimator

Runs the entire estimating department and owns the company's bid-win strategy, the senior leadership role this site's own Estimator and Senior Estimator progressions already named without ever backing it.

Commercial Manager

Owns a project's commercial outcome, negotiating changes and claims to a number rather than just filing the paperwork on them, a senior title this site's own Contracts Administrator career never quite reaches.

Cost Engineer

Tracks and forecasts a project's cost all the way through construction, not just at the bid, the estimator's counterpart for the life of the job rather than just its start.

Estimator

Prices the job before anyone breaks ground, so the bid actually makes money instead of just winning the work.

Heavy Civil Estimator

Estimates earthwork, utilities, and infrastructure work using an entirely different cost basis than pricing a building, opening the door to a whole side of the industry this site hadn't represented yet.

MEP Estimator

Prices mechanical, electrical, and plumbing systems, the single most expensive and coordination-heavy slice of most building budgets, through a lens general estimating alone doesn't train someone for.

Preconstruction Manager

Runs everything that has to happen before a shovel hits the ground, estimating, scheduling, and design coordination pulled into one team's responsibility.

Quantity Surveyor

Measures and values construction work in detail, a title that comes out of the UK/Commonwealth surveying tradition but increasingly shows up at U.S. firms with international ties.

Senior Estimator

Leads the bid on the biggest, most complex jobs and mentors the estimators doing the takeoffs underneath them.

Value Engineering Consultant

Leads the structured process of finding ways to cut cost without cutting function, a specialized advisory role built around a concept most newcomers walk right past without realizing it's a distinct career.

Business Development Manager

Builds the relationships and pursuit strategy behind a contractor's biggest wins, the senior counterpart to Construction Sales focused on major, long-cycle pursuits rather than direct selling.

Certified Payroll Specialist

Handles the specialized prevailing-wage payroll reporting that public-works contractors are legally required to file, a real back-office role built entirely around a concept this site already teaches.

Construction Accountant

Tracks the money on a job, job costing, retention, work-in-progress reporting, using accounting methods that look nothing like a typical retail or service business's books.

Construction Attorney

Handles the contract disputes, lien claims, and bond claims that show up throughout a project, the legal career path most newcomers never realize sits behind half the vocabulary on this site.

Construction Sales / Business Development

Wins the work that everyone else on the project team eventually gets to build, relationship-driven sales in an industry where the next job usually comes from the last client.

Contracts Administrator

Manages the paperwork that makes every relationship on a project legally enforceable, the prime contract, every subcontract, and every change to either.

Controller / CFO (Construction)

Owns a construction company's financial strategy, cash flow, and bonding relationship, the senior finance role this site's own Construction Accountant career already names as its own next step without ever backing it.

Credit Manager

Decides which customers get credit and chases down the ones who don't pay, construction's own lien-and-bond-aware version of a role that drives real revenue risk this site hadn't named yet.

Equipment / Fleet Manager

Owns a construction company's heavy equipment and vehicle fleet end to end, maintenance, utilization, buy-or-rent decisions, the telematics-driven role this site's own equipment-telematics concept described without naming who actually runs it.

Human Resources Manager (Construction)

Handles hiring, employee relations, and compliance for a construction company's workforce, with construction-specific wrinkles a general HR role doesn't have to deal with.

Marketing & Proposals Manager

Writes and designs the qualifications packages and proposals that actually win work, the distinct AEC specialty behind a trade association (SMPS) of its own that this site's own RFQ concept routed around without a backing career.

Operations Manager

Oversees multiple project teams and their Project Managers at once, the role that scales a contractor's capacity beyond what one PM can run.

Procurement Manager

Makes sure the right materials and equipment show up on the right jobsite at the right time, a job that's mostly invisible when it goes well and a schedule crisis when it doesn't.

Risk Manager

Owns a contracting company's own insurance and risk program, the contractor's-side counterpart to the insurance industry careers this site otherwise only covers from the claims side.

Architect

Designs the building itself, translating an owner's program and budget into drawings a contractor can build from and a jurisdiction will permit, then stays involved through construction to answer for what was designed.

BIM/VDC Specialist

Builds the 3D digital model of a project before it's built, so conflicts between trades get caught on a screen instead of on the jobsite.

Entry Level

CAD Technician

Turns a designer's or engineer's sketch and markup into a precise, buildable drawing, often the fastest way into the design side of construction without an architecture or engineering degree.

Civil Engineer

Designs the grading, drainage, and utility systems that make a site buildable before anyone can pour a foundation, the single biggest missing career on a site full of concepts that assume this role exists.

Construction Data Analyst

Turns the mountain of data construction generates, costs, schedules, safety incidents, productivity, into answers that change how the next project gets planned.

Construction Technology Manager

Oversees BIM, drone, and software rollout across a whole company, the director-level counterpart to the hands-on specialists who execute technology on a single project.

Drone/UAV Specialist

Flies drones to capture aerial imagery, topographic data, and progress documentation for a project, one of the few construction roles with a hard federal license requirement.

Fire Protection Engineer

Designs the sprinkler, alarm, and smoke-control systems that keep a building's occupants safe and its code officials satisfied, the life-safety specialist most MEP engineers call in rather than try to cover themselves.

Geotechnical Engineer

Investigates what's actually in the ground, soil, rock, and groundwater, and tells the structural and civil engineers what the foundation needs to handle before anyone designs one.

GIS Specialist

Works with the spatial data a Surveyor and Drone/UAV Specialist collect, turning raw location data into the maps and analysis a project actually uses.

Interior Designer

Designs the interior spaces people actually occupy, finishes, layout, lighting, and fixtures, working inside the architectural shell an architect already designed while still meeting the same code and accessibility rules.

Landscape Architect

Designs the outdoor spaces around a building, grading, planting, hardscape, and stormwater features, balancing a site's look and feel against the same drainage and permitting constraints a civil engineer works within.

MEP Engineer

Designs the mechanical, electrical, and plumbing systems that make a building livable, work behind three of the site's most concept-dense trades with no design-side career representing any of them until now.

Structural Engineer

Designs the structural steel, concrete, and foundation systems that keep a building standing, pairing with the trades that actually build what the drawings specify.

Surveyor

Establishes the exact boundaries, elevations, and reference points a project gets built against, the one role where being off by an inch can mean a building in the wrong place.

Blaster / Explosives Specialist

Plans and executes the controlled use of explosives to break rock, clear a site, or bring down a structure, the licensed role this site's own blasting concept named in prose without ever backing it with a career page.

Demolition Supervisor

Runs the high-risk process of taking a structure down safely, a distinct specialty most newcomers don't realize is its own career track until they see the certification behind it.

Environmental/Remediation Specialist

Manages hazardous materials on a construction or demolition site, lead paint, asbestos, contaminated soil, where which certification is legally required depends entirely on which hazard is actually involved.

Facilities Manager

Keeps a building running well after the construction crew leaves, maintenance, repairs, and the small renovation projects that never really stop.

Healthcare Construction Manager

Manages construction inside active hospitals and clinics, where infection control, patient safety, and continuous operations rule the schedule in ways a standard commercial build-out never has to plan around.

Historic Preservation Specialist

Makes sure a landmark or historic building gets restored the right way rather than just the fast way, pairing with a Restoration Project Manager but for buildings where the standards are legal, not just practical.

Modular / Offsite Construction Manager

Manages the handoff between factory and jobsite that modular and prefabricated projects depend on, the specialized coordination role this site's own modular-construction concepts described without a dedicated specialist behind it.

Owner's Representative

Works for the owner and only the owner, brought in specifically because everyone else on a project (the GC, the architect, the CM) has their own interests to balance too.

Deep Foundation / Pile-Driving Specialist

Runs the specialized equipment that drives piles and caissons deep into the ground to support a structure where a standard foundation won't work, a real, well-paid niche most newcomers never see.

Renewable Energy Project Manager

Manages solar, battery-storage, and microgrid builds from permitting through commissioning, the project-management path into the fastest-growing segment of the construction industry.

Restoration Project Manager

Runs the actual rebuild after property damage, the project management counterpart to the estimators and adjusters who scope and price the claim.

Tenant Improvement / Interior Construction Manager

Manages interior build-outs inside occupied commercial buildings, the fast-paced fit-out specialty with its own scheduling and tenant-coordination demands that general ground-up construction roles don't fully capture.

Builder's Risk Underwriter

Decides what a builder's risk policy actually covers before a loss ever happens, the underwriting side of insurance this site had only ever covered from the claims side.

Claims Examiner

Reviews and approves the claims an Insurance Adjuster investigates in the field, the desk-based quality-control layer between a field estimate and what the insurer actually pays out.

General Liability Underwriter

Decides whether and how to price a contractor's general liability exposure before a single claim ever happens, the casualty-side counterpart to the property-side Builder's Risk Underwriter this site already covers.

Insurance Adjuster (Property/Casualty)

Investigates property damage claims and decides what the insurance company will actually pay to fix it.

Insurance Broker

Places the general liability, builder's risk, and surety coverage a contractor actually needs, the sales and advisory side of construction insurance this site had only ever covered from the underwriting and claims side.

Insurance Restoration Estimator

Writes the repair estimate that turns a damage inspection into a number, the estimating specialist inside a claim, distinct from the adjusters who decide what actually gets paid.

Loss Control / Risk Engineer

Inspects jobsites on the insurer's behalf to manage risk before a loss happens, distinct from a Safety Manager who does similar work but for the contractor, not the insurance company.

Public Adjuster

Works for the policyholder, not the insurance company, the mirror image of the Insurance Adjuster role, hired to make sure a property owner's claim gets full and fair value.

Surety Bond Underwriter

Decides whether a contractor gets bonded at all, sitting behind every bid bond and performance bond this site already teaches without a career to represent it.

Surety Claims Manager

Investigates what actually happens after a bonded contractor defaults, the claims-side counterpart to the Surety Bond Underwriter this site already covers, who priced the risk before anything went wrong.

Workers' Compensation Claims Adjuster

Manages an injured construction worker's medical care and benefits from the first incident report through return to work, where the stakes and the regulations are both entirely different from a property claim.

Building Envelope Consultant

Designs and investigates the roofing, waterproofing, and curtain-wall systems that keep water and air out of a building, the specialty this site's own envelope concepts described from the installer's side but never from the designer's.

Code Consultant

Figures out how a complex project can actually meet the building and fire code, or build the case for an alternative path when it can't, the code-strategy counterpart to the Permit Expediter's paperwork-and-process role this site already covers.

Commissioning Agent

Independently verifies that a building's MEP systems actually work as designed before turnover, distinct from QA/QC and unrepresented on this site despite commissioning existing as a concept since the original build.

Construction Claims Consultant

Gets brought in when a project dispute is heading toward, or already in, a legal claim, to untangle what actually happened and what it's worth.

Construction Consultant (Cost/General)

Brought in for independent expertise on a specific problem, a troubled budget, a stalled schedule, a process that isn't working, rather than to run the day-to-day project.

Construction Mediator / Arbitrator

Serves as the neutral third party who actually resolves a construction dispute, the role this site's dispute-resolution concepts kept routing around without ever naming who sits in the chair.

Expert Witness (Construction Litigation)

Provides expert opinion testimony in a construction dispute, a role courts qualify case by case rather than one with its own license, though the underlying opinion sometimes requires one.

Permit Expediter

Navigates building permits, plan review, and zoning approvals on an owner's or GC's behalf, a specialized, low-visibility career built for someone detail-oriented who'd rather not work a jobsite.

Property Condition Assessor

Inspects a building's physical condition before someone buys, lends against, or invests in it, the due-diligence consulting role this site's own building-condition-assessment concept named only the client for, never the assessor.

Scheduling & Delay Consultant

Called in specifically to answer one question in a dispute, what actually caused the delay, and whose fault was it, using schedule data rather than opinion.

Specification Writer

Writes the technical specifications that spell out exactly what materials and methods a project must use, the half of the construction documents this site's drawing-focused careers almost never mention.

Sustainability / LEED Consultant

Guides a project through green building certification, most often LEED, managing the credits, documentation, and coordination that turn a design intent into a certified building.