Landscape Architect
Technology & Design
Designs the outdoor spaces around a building, grading, planting, hardscape, and stormwater features, balancing a site's look and feel against the same drainage and permitting constraints a civil engineer works within.

What is a Landscape Architect?
A Landscape Architect designs the outdoor environment around and between buildings: grading and planting plans, hardscape (walkways, plazas, retaining walls), site furnishings, and often stormwater features like bioswales and detention ponds. On a typical project, landscape architecture work runs alongside the Architect's building design and the Civil Engineer's utility and drainage design, and the Landscape Architect's plans become part of the permit set the jurisdiction reviews. Licensure requirements vary by state, but most states require a license to practice and stamp site design drawings independently.
What they do
- Design grading, planting, and hardscape plans for the outdoor areas of a site
- Select plant materials and site furnishings suited to the climate, soil, and maintenance budget
- Coordinate with civil engineers on site grading and stormwater management features
- Prepare construction documents and specifications for landscape contractors to bid and build from
- Navigate local landscape ordinances, tree preservation rules, and zoning requirements
- Visit the site during construction to confirm plantings and hardscape match the design
A typical day
- 8:30 AMFinalize a planting plan after confirming plant availability with a nursery
- 10:00 AMCoordinate with a civil engineer on how a bioswale ties into the site's grading plan
- 11:30 AMReview a jurisdiction's tree preservation comments on a submitted permit set
- 1:30 PMWalk a site under construction to confirm a retaining wall location matches the drawings
- 3:00 PMRevise a hardscape detail after a landscape contractor flags a constructability issue
Skills
Software
Pay expectations
Pay for this role, nationally
as of May 2025
Source: U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics (OEWS), Landscape Architects (SOC 17-1012), national data
Reviewed May 2025. Landscape Architect is typically reached through promotion or years of experience in a related role, not a day-one starting point, so this chart shows the pay range for people already working as a Landscape Architect rather than entry-level pay. "Lower range" is the lower part of the national wage distribution for this occupation, "typical" sits around the national median, and "top of scale" is the upper part, since pay isn't actually tracked by years on the job. Real pay varies a lot by state, metro area, union status, and employer, so scale these up or down for your market.
What this chart doesn't capture
Making Principal at a landscape architecture firm means buying into fee income tied to the firms' own client list and reputation, not a bigger salary line: real upside as a practice grows, tied to the same relationship-driven, site-development-cycle swings that drive the fees themselves.
These figures are wage-and-salary pay only. The Bureau of Labor Statistics excludes principals' and partners' equity distributions from this survey, since that income isn't a wage, it's a share of the firm's own fee revenue. Landscape architecture firm ownership stakes vary enormously by firm size, project mix, and how much client relationship a principal personally controls, and no single published figure captures it meaningfully. Worth understanding a specific firm's partnership track and buy-in terms directly before counting on a number.
Education
- Required:
- A professional degree from a LAAB-accredited landscape architecture program, typically a 4-5 year Bachelor of Landscape Architecture or a Master of Landscape Architecture, then a period of supervised work experience, then passing the Landscape Architect Registration Examination (LARE) administered through CLARB. Most states require a license to practice and stamp site design drawings independently.
- Not necessary:
- A background in construction trades; most landscape architects come directly from an accredited design program
Career progression
- 1.Landscape Designer / Intern
- 2.Landscape Architect
- 3.Senior Landscape Architect or Project Manager
- 4.Principal or Partner
Who hires for this role
Going after Landscape Architect work?
Technology & Design
- 01 · GET HIRED GUIDE
Know how hiring works
Who actually hires, where they look, and what to have ready.
Open →
- 02 · RESUME GUIDE
Build the resume
What a reviewer scans for, with bullets you can adapt.
Open →
- 03 · INTERVIEW PREP
Practice the conversation
The questions to expect and what each one is really asking.
Open →
- 04 · BLUEPRINT
Put it on a calendar
A dated, day-by-day plan built from all of the above.
Build mine →