Skip to main content
Software

SketchUp

Design & BIM

Trimble's 3D modeling software, known for being far easier to pick up than a full BIM platform like Revit, which is why it shows up everywhere from architecture firms to a contractor's own design-build sketches.

What it does

SketchUp trades some of Revit's deep parametric building intelligence for a much gentler learning curve, letting someone without formal CAD training build a real 3D model quickly. Its companion tool, LayOut, turns that 3D model into 2D construction documents, and higher tiers add point cloud and scan-to-3D workflows for modeling existing conditions. It can import and export Revit models and standard formats like IFC and DWG, so it fits into a project's workflow rather than replacing the rest of it.

Key features

  • An approachable 3D modeling interface that doesn't require the steeper learning curve of a full BIM platform
  • LayOut, a companion tool for turning a 3D model into 2D construction documents
  • Point cloud and scan-to-3D workflows on its higher tiers for modeling existing conditions
  • Import and export compatibility with Revit models and industry-standard formats like IFC and DWG

How it's actually used

  • A design-build contractor sketches a remodel concept in SketchUp to show a homeowner before committing to full construction drawings
  • A field team imports a point cloud scan of an existing building into SketchUp to model conditions that were never fully documented on paper

SketchUp Tutorial

Good to know

Pricing:
Subscription-based across several tiers, from a lighter web and iPad plan up through professional desktop and point cloud focused tiers.

Reviewed 2026-09. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.