Get Qualified
The cards that get you through the gate.
Plain-language study guides and practice questions for the certifications and licenses construction employers actually ask for. Start with the ones that need no experience.
- 21
- study guides
- 11
- need no experience
- 315
- practice questions
New to construction? Start with these.
No work experience required to sit any of them.
OSHA
Entry level
OSHA 10-Hour Construction
The entry-level safety credential most construction employers expect before you set foot on a jobsite, a broad overview of common jobsite hazards and how to avoid them.
- Practice
- 15 questions
- Built for
- Any role
Open study guide
NCCER
Entry level
NCCER Core Curriculum
The foundational credential behind most NCCER craft-training pathways, covering basic safety, tools, construction math, and employability skills that apply across every trade.
- Practice
- 15 questions
- Built for
- Any role
Open study guide
American Red Cross
Entry level
CPR/First Aid Certification
The lowest-barrier safety credential on this list, a trained first-aid and CPR provider is specifically what OSHA requires on a construction site without quick access to a hospital or clinic.
- Practice
- 15 questions
- Built for
- Any role
Open study guide
Every credential
Showing 21 study guides, grouped by the kind of work they matter most to.
Field & Trades
7 guides
OSHA
Entry level
OSHA 10-Hour Construction
The entry-level safety credential most construction employers expect before you set foot on a jobsite, a broad overview of common jobsite hazards and how to avoid them.
- Practice
- 15 questions
- Built for
- Any role
Open study guide
NCCER
Entry level
NCCER Core Curriculum
The foundational credential behind most NCCER craft-training pathways, covering basic safety, tools, construction math, and employability skills that apply across every trade.
- Practice
- 15 questions
- Built for
- Any role
Open study guide
American Red Cross
Entry level
CPR/First Aid Certification
The lowest-barrier safety credential on this list, a trained first-aid and CPR provider is specifically what OSHA requires on a construction site without quick access to a hospital or clinic.
- Practice
- 15 questions
- Built for
- Any role
Open study guide
NATE
Entry level
NATE Ready to Work
NATE's entry-level HVAC credential, built for someone just entering the field with little to no formal training yet, a certificate of basic job readiness rather than the full certification technicians usually mean when they say they're 'NATE certified.'
- Practice
- 15 questions
- Built for
- HVAC Technician
Open study guide
NCCCO
Experienced
NCCCO Mobile Crane Operator Certification
The certification most commonly used to satisfy OSHA's crane rule, a Core exam, a chosen specialty exam, and a hands-on practical test, not a single written test.
- Practice
- 15 questions
- Built for
- Equipment Operator
Open study guide
State board
Experienced
Journeyman Electrician License
Not one national exam but a state-by-state licensing process, earned only after years of documented, supervised hours, the credential that actually lets an electrician work unsupervised.
- Practice
- 15 questions
- Built for
- Electrician
Open study guide
State board
Experienced
Journeyman Plumber License
A state-by-state licensing process built on a two-tier apprenticeship path in many states, earned after years of documented hours under a licensed plumber and tested against a plumbing code that itself varies by jurisdiction.
- Practice
- 15 questions
- Built for
- Plumber
Open study guide
Project & Operations
8 guides
OSHA
Entry level
OSHA 30-Hour Construction
The deeper safety credential typically expected of supervisors and superintendents covers everything in the 10-hour course plus management-level safety responsibilities.
- Practice
- 15 questions
- Built for
- Any role
Open study guide
CSI
Entry level
CDT (Construction Documents Technologist)
An entry-level, no-experience-required credential from the Construction Specifications Institute covering how drawings, specifications, and contracts actually work together across a project.
- Practice
- 15 questions
- Built for
- Document Control Specialist
Open study guide
PMI
Entry level
CAPM (Certified Associate in Project Management)
An entry-level project management credential with no professional experience requirement, a common stepping stone for a Project Engineer or Assistant PM without the years of experience the PMP requires yet.
- Practice
- 15 questions
- Built for
- Project Manager
Open study guide
PMI
Experienced
PMP (Project Management Professional)
A widely recognized project management credential (not construction-specific, but common on senior construction PM job postings), rebalanced in 2026 toward business judgment and away from process mechanics.
- Practice
- 15 questions
- Built for
- Project Manager
Open study guide
CMAA
Experienced
CCM (Certified Construction Manager)
A construction-specific management credential (unlike the more general PMP) covering the full project lifecycle, gated by a reference-verified experience application before you're even approved to test.
- Practice
- 15 questions
- Built for
- Any role
Open study guide
AWS
Experienced
CWI (Certified Welding Inspector)
A three-part certification verifying the separate skill of inspecting and judging someone else's welds against a code, built on a sliding scale of welding education and real experience.
- Practice
- 15 questions
- Built for
- QA/QC Inspector
Open study guide
BCSP
Experienced
CHST (Construction Health and Safety Technician)
A BCSP credential that requires real construction safety experience before you can even sit the exam, a meaningfully higher bar than a training course like OSHA 30.
- Practice
- 15 questions
- Built for
- Safety Manager
Open study guide
ICC
Experienced
ICC Residential Building Inspector (B1)
A national, code-focused certification, used here as a representative example from ICC's larger catalog, built around the International Residential Code rather than one state's own licensing process.
- Practice
- 15 questions
- Built for
- QA/QC Inspector
Open study guide
Preconstruction & Estimating
1 guide
Technology & Design
4 guides
NCEES
Entry level
FE (Fundamentals of Engineering)
The entry point into engineering licensure, usually taken right at the end of an ABET-accredited engineering degree, well before the Professional Engineer (PE) exam most civil, structural, and MEP engineers eventually need.
- Practice
- 15 questions
- Built for
- Civil Engineer
Open study guide
Autodesk
Entry level
Autodesk Certified Professional (AutoCAD / Revit)
A software-specific credential proving hands-on proficiency in AutoCAD or Revit, with separate exams for each tool (and separate Revit exams by discipline), useful for design, drafting, and BIM-focused roles.
- Practice
- 15 questions
- Built for
- Any role
Open study guide
Procore Technologies
Entry level
Procore Certification
A free, software-specific credential from Procore itself, with separate role-based tracks (Project Manager, Superintendent, Estimator, and more) proving you can actually run the platform, a fast way to stand out if a job posting lists Procore experience as a plus.
- Practice
- 15 questions
- Built for
- Project Manager
Open study guide
USGBC
Entry level
LEED Green Associate
An entry-level sustainability credential covering green building principles and the LEED rating system, built on the current LEED v5 framework, useful for anyone whose work touches sustainable design or construction, no design background required.
- Practice
- 15 questions
- Built for
- Any role
Open study guide
Insurance & Claims
1 guide
Independent study material. BreakGroundU isn’t affiliated with or endorsed by any certifying body named here, and the practice questions are written independently, not taken from real exams. Each guide links to the official source for registration, pricing, and the real content outline. Looking for a class or apprenticeship instead? Browse training programs.
Credential in hand? Put it to work
Construction-wide
- 01 · GET HIRED GUIDE
Know how hiring works
Who actually hires, where they look, and what to have ready.
Open →
- 02 · RESUME GUIDE
Build the resume
What a reviewer scans for, with bullets you can adapt.
Open →
- 03 · INTERVIEW PREP
Practice the conversation
The questions to expect and what each one is really asking.
Open →
- 04 · BLUEPRINT
Put it on a calendar
A dated, day-by-day plan built from all of the above.
Build mine →