OSHA 30-Hour Construction
OSHA 30-Hour Construction Outreach Training
The deeper safety credential typically expected of supervisors and superintendents covers everything in the 10-hour course plus management-level safety responsibilities.
The real 30-hour course is built from mandatory and elective topics that add up to 30 hours, not one continuous lecture. The mandatory core (14 hours) covers Introduction to OSHA, Managing Safety and Health, the Focus Four hazards (6 hours, with a required 1.5-hour minimum on falls specifically), Personal Protective Equipment, Health Hazards in Construction, and Stairways and Ladders. On top of that, a trainee has to complete at least 6 elective topics (30 minutes minimum each, for 12 required hours) chosen from a list that includes confined spaces, cranes and rigging, excavations, scaffolds, steel erection, fire protection, materials handling, ergonomics, and motor vehicles and mechanized equipment, plus 4 more hours a trainer can use to go deeper on any topic. It's built for supervisors, foremen, and anyone with safety responsibility over a crew, so it keeps everything from the 10-hour course but adds the management side: building a safety program, running inspections, and knowing when a hazard needs a formal procedure rather than just personal caution.
Structurally, it mirrors the 10-hour course's pass bar (module quizzes and a final exam both scored at 70%) but at real scale, around 300 knowledge checks spread across 19 lesson modules, plus a comprehensive final exam. Because a trainer can only deliver 7.5 instructional hours a day, a legitimate 30-hour course has to run over a minimum of 4 calendar days, which is worth knowing since a card claimed from a 1-day "30-hour" course is a sign the course wasn't run to program requirements. As with the 10-hour course, the completion card is issued by the OSHA-authorized trainer rather than by OSHA itself, and it doesn't expire.
Because OSHA 30 is built for people making safety calls on behalf of other people, not just for themselves, the material worth studying hardest is the judgment calls: who has the authority to stop a task, who's responsible for catching a hazard before it becomes an incident, and which situations need a formal, documented procedure rather than a supervisor's on-the-spot decision. The real exam leans into scenario-based questions for exactly this reason, less "what is a confined space" and more "you're the supervisor and this is happening, what do you actually do." Reviewing the difference between what OSHA 10 expects an individual worker to recognize and what OSHA 30 expects a supervisor to actually do about it is the fastest way to study the added material, instead of re-learning the Focus Four from scratch.
Two topics worth knowing cold, even though neither gets its own dedicated hour count in the official outline: OSHA's recordkeeping rule, which makes the employer, in practice often the supervisor closest to the incident, responsible for logging qualifying injuries and illnesses on the OSHA 300 log, and the multi-employer citation policy, the enforcement framework OSHA actually uses on a typical jobsite where a general contractor and several subcontractors are all present at once. Under that policy, a company can be cited as the creating, exposing, correcting, or controlling employer depending on its actual role, meaning a general contractor's supervisor can be held responsible for a hazard a subcontractor's crew created, if the GC had the authority to make them fix it and didn't. It's one of the clearest examples of why OSHA 30 spends so much time on supervisory responsibility rather than just hazard recognition.
Because the course runs at real scale, roughly 300 knowledge checks and a comprehensive final, spreading it across more than one sitting tends to produce better retention than trying to power through all 30 hours in a couple of long days, even where a provider technically allows it. Cost reflects that scale too: an online OSHA 30 course typically runs $160 to $190, while an in-person version with a live instructor runs considerably more, often $500 to $700, since it requires several full days of a certified trainer's time rather than a single classroom session.
The practice questions below are original, written to test the same kind of supervisor-level judgment the real exam does, not a copy of any real OSHA question. If you haven't already, the 10-Hour Construction exam covers the entry-level version of this same material, and How a Jobsite Actually Stays Safe walks through a real safety scenario end to end.
HardHatU is an independent study resource and is not affiliated with, endorsed by, or sponsored by OSHA (Occupational Safety and Health Administration). "OSHA 30-Hour Construction Outreach Training" and any related names are trademarks of their respective owners, referenced here only so you can find the right exam to prepare for. Practice questions here are written independently and are not real exam content.
For official registration, pricing, and the real exam content outline, go straight to OSHA (Occupational Safety and Health Administration)'s own page.
Practice questions
Quick check: 1 of 15
Who is the OSHA 30-Hour Construction course actually built for?
Quick check: 2 of 15
The 30-hour course's mandatory topics include 6 hours on the Focus Four hazards, with a specific minimum carved out for one of them. Which hazard has its own required minimum, and how much?
Quick check: 3 of 15
Beyond the mandatory topics, OSHA 30 requires trainees to complete elective modules. How does that requirement work?
Quick check: 4 of 15
A legitimate OSHA 30 course has a minimum delivery timeline. What is it?
Quick check: 5 of 15
A worker needs to enter a space that's large enough to work in but has limited entry/exit and isn't designed for continuous occupancy, like a manhole or a storage tank. Before authorizing entry, what does a supervisor need to determine first?
Quick check: 6 of 15
Who is responsible for the daily inspection of a scaffold before a crew works on it?
Quick check: 7 of 15
OSHA 30's "Managing Safety and Health" module is a mandatory topic, not an elective. Why does the course treat a documented safety and health program as its own required subject?
Quick check: 8 of 15
Ergonomics is one of OSHA 30's elective topics. Which of these is a genuine ergonomic risk factor the module would flag on a jobsite?
Quick check: 9 of 15
A backup alarm on a piece of mechanized equipment isn't working. Under the "Motor Vehicles and Mechanized Equipment" topic, whose responsibility is it to catch that before it becomes a struck-by incident?
Quick check: 10 of 15
Compared to the OSHA 10-Hour course, what is the core difference in how OSHA 30 approaches the same Focus Four hazards?
Quick check: 11 of 15
How far can a worker be from the nearest portable fire extinguisher on a construction site under OSHA's travel-distance rule?
Quick check: 12 of 15
Who is legally allowed to operate a crane on a construction site under OSHA's crane operator requirements?
Quick check: 13 of 15
On an excavation site, who has the authority to classify the soil type and determine what protective system (shoring, shielding, or sloping) a trench actually needs?
Quick check: 14 of 15
When a workplace injury meets OSHA's recordability criteria, whose responsibility is it to log it on the OSHA 300 log?
Quick check: 15 of 15
A subcontractor's crew creates an unguarded floor opening, but a different subcontractor's worker is the one who falls through it. Under OSHA's multi-employer citation policy, can the general contractor's supervisor be held responsible even though their own crew didn't create the hazard?
Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.