Skip to main content
Get Qualified
Entry Level

OSHA 10-Hour Construction

OSHA 10-Hour Construction Outreach Training

The entry-level safety credential most construction employers expect before you set foot on a jobsite, a broad overview of common jobsite hazards and how to avoid them.

The real 10-hour course covers 9 modules built around the Focus Four hazards, falls, electrocution, struck-by, and caught-in or -between, plus personal protective equipment, health hazards like silica dust and noise, materials handling, and hand and power tool safety, all built on real OSHA citation data from actual jobsites. It also covers the basics of the standard the course draws from (29 CFR 1926), plus workers' rights: the right to a safe workplace, the right to file a complaint without retaliation, and the right to see your own injury and illness records.

Structurally, it's not one long lecture with a single test at the end. Each module has its own short quiz (a 70% score to move on), and the course wraps with a comprehensive final exam pulling from every module, also scored at 70% to pass, with up to three attempts allowed and the whole course completed within 180 days. There's no minimum age to take it, the completion card doesn't expire, and it's issued by your OSHA-authorized trainer, not OSHA itself, usually within 90 days of finishing.

The real value in preparing for OSHA 10 isn't memorizing trivia, it's building the habit of actually noticing hazards before they hurt someone. That said, a few things are worth deliberately studying rather than assuming you already know: the specific numbers (fall protection thresholds, trench depths, noise limits) tend to differ from what feels intuitive, and the real exam likes to test whether you know a number applies in one context but not another, like fall protection kicking in at 6 feet on a typical site but 10 feet on a scaffold. Reviewing the Focus Four hazards until you can name all four without hesitating, and paying close attention to any place the course draws a line between "general construction" and a more specific situation (scaffolds, steel erection, excavation), covers a disproportionate share of what actually shows up on both the module quizzes and the final.

OSHA 10 isn't federally required for every private construction job nationwide, but treating it as optional is a mistake in practice: most general contractors and staffing agencies require it before they'll let anyone on a jobsite, and a handful of states have made it a legal requirement rather than just a hiring preference. Missouri requires it within 60 days of starting on a public works project, Nevada requires every construction worker statewide, public or private, to have it within 15 days of hire, and New York, Connecticut, Massachusetts, New Hampshire, Rhode Island, and West Virginia all require it on public or publicly funded construction above specific dollar thresholds, Massachusetts has the lowest threshold in the country at just $10,000. Requirements like these change over time, so it's worth confirming directly with an employer or state labor department rather than assuming a state's rule, or lack of one, still matches what's written somewhere online.

Course cost varies by delivery format more than by provider: an online OSHA 10 course typically runs somewhere in the $60 to $80 range, while an in-person class with a live instructor usually costs $200 to $300, reflecting the cost of a classroom and instructor time rather than a difference in what's actually taught. Either way, the only cards that count are the ones issued through an OSHA-authorized trainer; OSHA has publicly warned about fraudulent "cards" sold online that were never actually earned through a real course, so it's worth confirming a provider is legitimately authorized before paying for anything.

The practice questions below are original, written to test the same kind of hazard-recognition judgment the real exam does, not a copy of any real OSHA question. If you want the hands-on version of this material instead of a test-style rundown, How a Jobsite Actually Stays Safe walks through a real safety scenario end to end.

BreakGroundU is an independent study resource and is not affiliated with, endorsed by, or sponsored by OSHA (Occupational Safety and Health Administration). "OSHA 10-Hour Construction Outreach Training" and any related names are trademarks of their respective owners, referenced here only so you can find the right exam to prepare for. Practice questions here are written independently and are not real exam content.

For official registration, pricing, and the real exam content outline, go straight to OSHA (Occupational Safety and Health Administration)'s own page.

Practice questions

Quick check: 1 of 15

Which four hazards does OSHA's "Focus Four" cover, the ones responsible for the majority of construction worker deaths?

Quick check: 2 of 15

On a typical construction site (not scaffolds or steel erection, which have their own separate rules), OSHA requires fall protection starting at what height?

Quick check: 3 of 15

Why does the 10-hour course spend time on Ground Fault Circuit Interrupters (GFCIs)?

Quick check: 4 of 15

Where does personal protective equipment (PPE) sit in OSHA's hierarchy of hazard controls?

Quick check: 5 of 15

An unprotected trench becomes a caught-in/between hazard requiring a protective system (shoring, shielding, or sloping) at what depth, unless it's cut into stable rock?

Quick check: 6 of 15

You're working near a dump truck that's backing up, and you notice its back-up alarm isn't sounding. What does OSHA 10's hazard-avoidance approach say to do?

Quick check: 7 of 15

Cutting or grinding concrete and masonry dry throws respirable crystalline silica into the air. Why does OSHA 10 treat this as a serious health hazard rather than just dust and cleanup?

Quick check: 8 of 15

Under OSHA's Hazard Communication standard, where would you look to learn about the specific hazards of a chemical product you're about to use on site?

Quick check: 9 of 15

Which of the following is a right OSHA 10 explicitly covers, protected under federal law?

Quick check: 10 of 15

Scaffolds have their own fall-protection rule, separate from the general construction 6-foot threshold. At what height does fall protection become required on a scaffold?

Quick check: 11 of 15

A worker starts showing heavy sweating, weakness, and nausea on a hot afternoon. A coworker notices they've stopped sweating and seem confused. What does that change in symptoms most likely signal?

Quick check: 12 of 15

When setting up an extension ladder against a wall, what's the correct base-to-height ratio to keep it from kicking out?

Quick check: 13 of 15

OSHA's construction noise standard sets a permissible exposure limit for an 8-hour workday. What is it?

Quick check: 14 of 15

What's the safest way to manually lift a heavy box off the ground?

Quick check: 15 of 15

A crew is working overhead on scaffolding. What protects a worker walking underneath from a falling tool or piece of debris?

Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.

Programs that include or build on this

Real apprenticeships, trade schools, and certificate programs connected to this page.

Browse all 22 connected programs →

Credential in hand? Put it to work

Field & Trades

  1. 01 · GET HIRED GUIDE

    Know how hiring works

    Who actually hires, where they look, and what to have ready.

    Open →

  2. 02 · RESUME GUIDE

    Build the resume

    What a reviewer scans for, with bullets you can adapt.

    Open →

  3. 03 · INTERVIEW PREP

    Practice the conversation

    The questions to expect and what each one is really asking.

    Open →

  4. 04 · BLUEPRINT

    Put it on a calendar

    A dated, day-by-day plan built from all of the above.

    Build mine →