Welder

Field & Trades

Joins metal components with heat and pressure, and for structural work, has to prove it on a certification test before being allowed to do it on a real building.

Welder

What is a Welder?

A Welder joins metal components using heat, pressure, or both: most visibly, the structural steel connections that hold a building's frame together, but also metal decking, handrails, and miscellaneous steel throughout a project. For structural steel work governed by the American Welding Society's D1.1 Structural Welding Code (the code most commercial structural steel is built to), a welder has to pass a certification test for the specific process, material, and position they'll actually be welding in before they're allowed to perform that code work: a real, contractually enforced requirement, even though it isn't a government-issued license the way a journeyman electrician license is.

What they do

A typical day

Skills

Reading welding symbols and structural drawingsPrecision welding across multiple processes (e.g. stick, MIG, TIG) and positionsVisual weld inspectionWorking safely with high heat and fire hazardsPhysical stamina and steady hands in awkward positions

Software

none typically required for the trade itself

Education

Required:
High school diploma or equivalent, then trade school or a registered apprenticeship; for structural or pressure welding work, passing a certification test to the applicable welding code (most commonly AWS D1.1 for structural steel) for the specific process and position being performed, required by the code and the contract, not optional for that scope of work
Preferred:
Additional process-specific certifications as project scopes require them
Not necessary:
A four-year college degree; trade school or apprenticeship leading to code certification is the standard path

Career progression

  1. 1.Apprentice Welder
  2. 2.Certified Welder
  3. 3.Welding Foreman
  4. 4.Certified Welding Inspector (CWI) or Welding Contractor

Who hires for this role

Structural Steel SubcontractorsGeneral Contractors (on projects that self-perform steel work)Fabrication Shops