QA/QC Inspector
Project & Operations
Physically inspects and tests completed work against the specifications, the hands-on counterpart to a Quality Control Manager's oversight role.

What is a QA/QC Inspector?
A QA/QC Inspector performs the hands-on inspection and testing that a project's quality control program requires, checking completed work against drawings and specifications, running or witnessing material tests, and documenting the results. It's distinct from a Quality Control Manager, who designs and oversees the quality program for the whole project; an inspector is the person actually walking the work, pulling concrete cylinders, checking weld quality, and writing up the non-conformance reports when something doesn't meet spec.
What they do
- Inspect completed work against drawings, specifications, and applicable codes
- Witness or perform material testing (concrete, soils, welds) and document results
- Complete special inspection reports required by the building code for structural and life-safety systems
- Write non-conformance reports when work doesn't meet specification
- Verify corrective work before it's covered up by the next trade
- Maintain inspection and testing records for the project's quality and closeout files
A typical day
- 6:30 AMReview the day's inspection schedule and required tests
- 7:30 AMWitness concrete placement and pull test cylinders for a structural pour
- 10:30 AMInspect completed structural welds against the project's welding specification
- 1:00 PMWrite a non-conformance report for a completed wall assembly that doesn't match the fire-rated spec
- 3:00 PMVerify a subcontractor's corrective work before it gets covered by drywall
Skills
Software
Pay expectations
Pay for this role, nationally
as of October 2026
Source: BLS Construction and Building Inspectors detailed occupation data cross-checked against ZipRecruiter's Construction Inspector percentiles; the entry and typical bands were already close to accurate, only the top of scale needed raising
Reviewed October 2026. QA/QC Inspector is typically reached through promotion or years of experience in a related role, not a day-one starting point, so this chart shows the pay range for people already working as a QA/QC Inspector rather than entry-level pay. "Lower range" is the lower part of the national wage distribution for this occupation, "typical" sits around the national median, and "top of scale" is the upper part, since pay isn't actually tracked by years on the job. Real pay varies a lot by state, metro area, union status, and employer, so scale these up or down for your market.
Education
- Required:
- High school diploma or equivalent, plus relevant field or trade experience; specific requirements depend on the type of inspection being performed
- Preferred:
- A discipline-specific certification depending on specialty, such as the American Welding Society's Certified Welding Inspector (CWI) for welding inspection, ACI's Concrete Field Testing Technician certification for concrete testing, or NICET's Construction Materials Testing certification for soils, asphalt, or concrete work
- Helpful:
- OSHA 10 or 30 certification, and an ICC certification for code-related inspections
- Not necessary:
- A four-year engineering degree; this role is built on hands-on inspection and testing expertise, often gained in a trade before moving into inspection
Career progression
- 1.Field Technician or Inspector-in-Training
- 2.QA/QC Inspector
- 3.Senior Inspector or Multi-Discipline Inspector
- 4.Quality Control Manager
Who hires for this role
Going after QA/QC Inspector work?
Project & Operations
- 01 · GET HIRED GUIDE
Know how hiring works
Who actually hires, where they look, and what to have ready.
Open →
- 02 · RESUME GUIDE
Build the resume
What a reviewer scans for, with bullets you can adapt.
Open →
- 03 · INTERVIEW PREP
Practice the conversation
The questions to expect and what each one is really asking.
Open →
- 04 · BLUEPRINT
Put it on a calendar
A dated, day-by-day plan built from all of the above.
Build mine →
Explore next