Skip to main content
Software

Bluebeam Revu

Document markup & takeoff

Nemetschek's PDF markup and measurement tool that has become the standard way construction teams review drawings, redline plans, and run digital takeoffs, on desktop, in a browser, or from a phone on the jobsite.

What it does

Revu turns a static PDF drawing set into something a whole project team can actually work inside. A reviewer marks up a sheet with text notes, shapes, or freehand annotations calibrated to the drawing's real scale, so a measurement taken on screen matches the real building. Its Studio Sessions feature lets multiple people open the same drawing set at once and see each other's markups appear live, instead of emailing separate marked-up copies back and forth and reconciling them by hand afterward.

Key features

  • PDF markup and redlining with text, shapes, stamps, and freehand tools calibrated to a drawing's actual scale
  • Measurement tools for length, area, volume, and count, used for takeoffs and quantity checks directly on the digital plan set
  • Studio Sessions, letting multiple reviewers mark up the same drawing set at the same time and see each other's changes appear live
  • Version comparison that shows exactly what changed between two revisions of the same sheet

How it's actually used

  • A project engineer marks up a dimension question directly on a submittal drawing and shares it through a Studio Session instead of describing the location in a separate email
  • A quality control manager compares a newly issued drawing revision against the previous version to see exactly what changed before it reaches the field

Bluebeam Revu Tutorial

Good to know

Pricing:
Subscription-based, licensed per user per year across several plan tiers, from a basic markup-only tier up through higher tiers that add the advanced measurement and collaboration tools, with the option to mix different plan levels across one team.

Reviewed 2026-09. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.