Privacy Policy
Last updated: November 17, 2026
Overview
BreakGroundU is a construction career and education site provided by an independent operator, referred to here as "BreakGroundU," "we," or "us." Careers and Concepts are free to read without an account. Lessons, Interview Prep, Exam Prep, Get Hired guidance, Resume Guides, Phases, Software profiles, and the Action Plan require a free account to access; the Career Match Quiz can be taken by anyone, but you need to sign in to see your result. This policy explains what information BreakGroundU collects because of that, how it's used, and what stays automatic and anonymous. If you have questions, reach out at contact@breakgroundu.com.
Information you provide to us
Creating an account is optional, and only needed for the content and features listed above. If you create one, we collect:
- Your email address. Required to sign in, whether by a one-time emailed code or by signing in with Google.
- Basic profile info from Google, if you use it to sign in. Google shares your name and profile photo with our sign-in provider; we don't ask for anything beyond that, and we never see or store your Google password.
We don't handle passwords directly at all. Sign-in itself is handled by Clerk, a third-party authentication provider described below; BreakGroundU never sees a password you create with them.
Information collected automatically from your account
Once you're signed in, we store:
- Progress on content you mark complete (which lessons, exam-prep guides, and similar items), so the site can show you what you've already finished.
- Your Career Match Quiz result, if you're signed in when you reach the result screen: which career category you matched with and which specific careers the quiz surfaced for you.
- Action Plans you save: the career you chose, whether you're applying now or still exploring, the location you typed in (a city, state or ZIP code), the hours per week and timeline you picked, any certifications you said you already hold, and which plan steps you've checked off.
None of this is shared outside BreakGroundU tied to your identity. We do review this data in aggregate, anonymized form (for example, how many people completed a given lesson, how quiz results are distributed across career categories, or which states people are planning job searches in) to decide what content to build next and, potentially, to describe our audience in general terms to partners such as schools, training programs and employers. That aggregate review never identifies an individual visitor.
We do not sell personal information, and we do not share it with anyone for targeted or behavioral advertising. BreakGroundU does not run ads.
Information stored in your browser
A few features remember small things in your own browser (using its local or session storage) rather than on our servers: for example, that you already dismissed a sign-in prompt, how long a lesson preview has been open, an unsaved quiz result while you sign in, or that you have already seen an intro animation. This stays on your device and you can clear it at any time through your browser's settings.
Searches you run
If you look for live job openings from an Action Plan, the trade and location you searched for are sent from our server to our job-listing provider (Adzuna) to fetch results. Your name, email and account are not sent with that search.
We use your email address to sign you in and to reply if you write to us. We don't send a newsletter or marketing email, and creating an account doesn't add you to a mailing list. If that ever changes, we'll update this policy first.
Accounts created before November 17, 2026 were added to a mailing list run by Buttondown. You can unsubscribe using the link in any email from it, or ask us to remove you. Emails sent through Buttondown may include standard open and click tracking, the same as most email services use, see Buttondown's own privacy policy for how they handle that.
Traffic analytics
Separately from account data, the site uses Vercel Analytics and Google Analytics to understand aggregate traffic: which pages get read, roughly how visitors arrive, and general location (city/region level, from IP address), device, and browser information. Vercel Analytics runs without setting tracking cookies. Google Analytics does set cookies, described below. Neither tool is used to identify a specific person, and this traffic data isn't combined with your account information.
Some links to BreakGroundU carry a short tag in the address (for example, a link a school counselor shares). That tag only tells us which school or source a visit came from, so we can report total visits back to them. It never identifies a student.
Cookies
Analytics cookies. Google Analytics sets a small number of cookies on this site, mainly _ga and _ga_*, which last up to about two years. They don't contain your name or anything directly identifying, just a randomly generated ID used to recognize that the same browser has visited before. Vercel Analytics does not set any cookies. You can block or delete these cookies through your browser's settings at any time, or use Google's Analytics Opt-out Browser Add-on to stop Google Analytics from seeing your visits to any site, not just this one.
Sign-in cookies. If you create an account, our authentication provider (Clerk) sets a cookie that keeps you signed in between visits. This one is strictly functional: it isn't used for advertising or tracking you across other sites, and it's required for sign-in to work at all. It clears automatically after a period of inactivity or when you sign out.
Third-party services we use
A few outside services help run BreakGroundU and process data on our behalf, each bound by their own privacy terms:
- Clerk, handles account sign-in, including Google sign-in, and stores your email and basic profile info.
- Neon, hosts the database that stores your progress and quiz-result data.
- Buttondown, holds the mailing list described above for accounts created before November 17, 2026.
- Vercel, hosts the site and provides Vercel Analytics.
- Google, provides Google Analytics, the web fonts the site loads (which means your browser requests them from Google's servers, sharing your IP address the way any web request does) and, if you choose to use it, Google sign-in.
- YouTube, plays the tutorial videos on software pages. Videos load in YouTube's privacy-enhanced mode, which doesn't store viewing information until you press play.
- Adzuna, supplies live job listings when you search for openings, as described above.
These services are based in the United States or operate there, and your information is stored and processed in the United States.
How we protect your information
We collect as little as we need, use established providers for sign-in, hosting and email, keep secret keys on the server only, and limit who can see account data. No website can promise perfect security, but if we ever learn of a breach that affects your personal information, we'll notify you as required by law.
Your choices and rights
We keep your account, progress, quiz-result and Action Plan data for as long as your account exists. You can delete a saved Action Plan yourself at any time. To get a copy of the data tied to your account, correct it, or delete your account entirely, email contact@breakgroundu.com from the address on your account. For a deletion, we'll remove your stored progress, quiz results and plans, remove your email from the mailing list, and delete your account. We aim to respond within 30 days, and we won't treat you differently for asking.
Third-party links
Some pages, particularly the software profiles, link out to third-party websites and embed YouTube videos. Those sites and services have their own privacy practices, which this policy doesn't cover. Visiting or interacting with them is subject to their own terms.
Children's privacy
BreakGroundU is written for high school students, career changers, and the parents, counselors and teachers who help them. It is not directed to children under 13, and you must be at least 13 to create an account. We don't knowingly collect personal information from children under 13. If we learn that we have, we'll delete it promptly. If you believe a child under 13 has created an account, contact us at contact@breakgroundu.com and we'll remove it.
If you're under 18, please review this policy with a parent or guardian before creating an account. A parent or guardian can also ask us to delete a teen's account and data by emailing the address above.
Changes to this policy
As BreakGroundU adds features, this policy will be updated to match, and the "Last updated" date at the top will change whenever it does. We'll make a reasonable effort to call out material changes clearly rather than folding them in quietly.
Contact
Questions about this policy or how the site handles information can go to contact@breakgroundu.com.