Career
Glazier
Field & Trades
Installs the glass, curtain wall, and storefront systems that give a building its skin, precision work where a fraction of an inch off is the difference between a weathertight seal and a leak.
What is a Glazier?
A Glazier cuts, fits, and installs glass and metal glazing systems on a project, from full curtain wall and storefront systems on commercial buildings to windows, mirrors, and interior glass partitions. Much of the work happens well into a project, once the structural frame is up and the building needs its exterior skin, and a lot of it happens at height, on scaffolding or a swing stage, coordinating tight tolerances with the structural steel or framing crew that set the openings.
What they do
- Install curtain wall panels and storefront systems per shop drawings and manufacturer specs
- Cut, fit, and set glass panes to exact frame dimensions
- Apply sealants and glazing compounds to create a weathertight seal around installed glass
- Install mirrors, glass partitions, and skylights
- Read curtain wall and storefront shop drawings to plan sequencing and material needs
- Coordinate with structural steel and framing crews so openings come in at the tolerances glazing requires
A typical day
- 6:30 AMReview the day's curtain wall installation sequence and stage glass panels at the hoist
- 7:00 AMSet and secure curtain wall units on the level currently underway, checking plumb and level as each panel goes in
- 10:30 AMApply sealant and weatherproofing around a completed section of storefront glazing
- 1:00 PMFit and install interior glass partitions on a lower, already-enclosed floor
- 3:30 PMWalk completed glazing with the foreman, checking for gaps, scratches, or seal defects before the next trade moves in
Skills
Reading curtain wall and storefront shop drawingsPrecise measurement and cuttingSealant and glazing compound applicationWorking safely at heightMath for angles, dimensions, and material takeoff
Software
Generally none; this is a hands-on field trade
Education
- Required:
- High school diploma or equivalent, then a registered apprenticeship (typically three years or more, with a minimum of 144 hours of classroom instruction per year plus paid on-the-job training through a union program like IUPAT); most states don't separately license glaziers the way they do electricians or plumbers
- Helpful:
- OSHA 10 or 30 certification (not a nationwide legal requirement, though several states, including New York, Massachusetts, Connecticut, Nevada, Missouri, and Rhode Island, legally require it for workers on public construction projects), plus fall protection or aerial/scissor lift certification given how much of the work happens at height
- Not necessary:
- A four-year college degree; the apprenticeship-to-journeyman route is the standard path into the trade
Career progression
- 1.Apprentice Glazier
- 2.Journeyman Glazier
- 3.Glazing Foreman
- 4.Glazing Contractor or Superintendent
Who hires for this role
Glazing and Curtain Wall SubcontractorsGeneral Contractors (on projects that self-perform some glazing)Window, Storefront, and Curtain Wall Manufacturers/Installers
Explore next
Curtain WallGlazingStorefront SystemWindowsDoors & FramesDoor HardwareBuilding EnvelopeWaterproofingFlashingIronworkerSuperintendentElevator & Escalator TechnicianOSHA 10-Hour ConstructionNCCER Core CurriculumField & Trades Interview GuideHow a Building Actually Gets Built, Foundation to FinishConstructionWind Load & Hurricane Code RequirementsJoint Sealants