FE (Fundamentals of Engineering)
Fundamentals of Engineering (FE) Exam
The entry point into engineering licensure, usually taken right at the end of an ABET-accredited engineering degree, well before the Professional Engineer (PE) exam most civil, structural, and MEP engineers eventually need.
The FE exam is 110 questions inside a roughly 6-hour appointment (a short nondisclosure agreement and tutorial, 5 hours and 20 minutes of actual exam time, and a scheduled break), computer-based at NCEES-approved Pearson VUE test centers, offered year-round rather than on fixed testing cycles. There isn't one single FE exam; candidates choose a discipline-specific version (Civil, Mechanical, Electrical and Computer, Environmental, Industrial, Chemical, and several others) that matches their engineering major, not their eventual job title, alongside a shared set of general topics every version covers regardless of discipline: ethics and professional practice, safety, and engineering economics.
It's designed to be taken near the end of an ABET-accredited engineering degree, not after it, and definitely not after years of work experience the way some licensing exams are structured. The only reference material allowed is a digital, NCEES-supplied reference handbook provided electronically during the exam itself, not a textbook or notes brought from outside.
Results come back pass or fail only, with no numeric score shown to anyone who passes; candidates who don't pass get a diagnostic report broken down by topic area instead. The exam costs $225 (slightly more at some international testing locations), and NCEES caps attempts at one per testing window and no more than three total within any 12-month period.
Passing earns Engineer Intern (EI) status, sometimes called Engineer in Training (EIT) depending on the state, which is the formally recognized first step toward a Professional Engineer (PE) license, not the license itself. From there, the standard path is typically four years of progressive experience working under a licensed PE before becoming eligible to sit for the discipline-specific PE exam.
On this site, Civil Engineer, Structural Engineer, and MEP Engineer careers all describe this same FE-then-experience-then-PE path, just ending in a different discipline-specific PE exam. It's worth not confusing this with Surveyor licensure, which also runs through NCEES but uses a completely separate exam pair, the Fundamentals of Surveying (FS) and Principles and Practice of Surveying (PS) exams, not FE and PE at all.
The practice questions below are original, covering the exam's real structure and the engineering-licensure process around it, not any actual FE exam content, which NCEES keeps strictly confidential and which this site has no access to regardless. If becoming a licensed engineer through this path interests you, Civil Engineer, Structural Engineer, and MEP Engineer all walk through what the work and progression actually look like.
BreakGroundU is an independent study resource and is not affiliated with, endorsed by, or sponsored by NCEES (National Council of Examiners for Engineering and Surveying). "Fundamentals of Engineering (FE) Exam" and any related names are trademarks of their respective owners, referenced here only so you can find the right exam to prepare for. Practice questions here are written independently and are not real exam content.
For official registration, pricing, and the real exam content outline, go straight to NCEES (National Council of Examiners for Engineering and Surveying)'s own page.
Practice questions
Quick check: 1 of 15
Who is the FE exam actually designed for?
Quick check: 2 of 15
Do you have to wait until after graduating to take the FE exam?
Quick check: 3 of 15
How many questions are on the FE exam, and how is the appointment time structured?
Quick check: 4 of 15
How is the FE exam scored and reported?
Quick check: 5 of 15
Which of these is NOT an actual FE exam discipline version?
Quick check: 6 of 15
How much does it cost to sit the FE exam?
Quick check: 7 of 15
How many times can a candidate attempt the FE exam?
Quick check: 8 of 15
Where is the FE exam administered?
Quick check: 9 of 15
What credential does passing the FE exam actually earn you?
Quick check: 10 of 15
After passing the FE exam, what's generally required before someone is eligible to sit for the PE exam?
Quick check: 11 of 15
On this site, which careers describe this same FE-then-experience-then-PE path?
Quick check: 12 of 15
A Land Surveyor also tests through NCEES, but through a completely different exam pair. What are those called?
Quick check: 13 of 15
What's true about the reference material allowed during the FE exam?
Quick check: 14 of 15
What topics appear on every version of the FE exam, regardless of discipline, in addition to discipline-specific technical content?
Quick check: 15 of 15
For someone planning toward a Civil, Structural, or MEP Engineer career, when does the FE realistically fit into the overall timeline?
Reviewed 2026-10. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.
Credential in hand? Put it to work
Technology & Design
- 01 · GET HIRED GUIDE
Know how hiring works
Who actually hires, where they look, and what to have ready.
Open →
- 02 · RESUME GUIDE
Build the resume
What a reviewer scans for, with bullets you can adapt.
Open →
- 03 · INTERVIEW PREP
Practice the conversation
The questions to expect and what each one is really asking.
Open →
- 04 · BLUEPRINT
Put it on a calendar
A dated, day-by-day plan built from all of the above.
Build mine →