Certified Construction Manager (CCM)

A construction-specific management credential (unlike the more general PMP) covering the full project lifecycle, gated by a reference-verified experience application before you're even approved to test.

The CCM exam is 175 multiple-choice questions over 240 minutes (150 scored, 25 unscored pilot items), requiring a 72% overall score to pass, a fixed, published cut score, a real contrast with PMI's PMP/CAPM approach of never publishing one at all. The exam draws from 10 knowledge domains: Program & Project Management (20%, the largest single domain), Cost Management, Time Management, Contract Administration, Quality Management, Safety Management, Risk Management, and Professional Practice (10% each), and Sustainability and Technology (5% each), covering the full construction project lifecycle rather than general management theory.

What makes the CCM distinct from a credential like the PMP starts well before the exam itself: candidates have to submit a detailed application documenting "Responsible-in-Charge" (RIC) experience, real accountability for supervising construction management work, not just time spent on a job site, and get that experience verified by at least two references (clients, supervisors, or current CCMs) before being approved into a one-year candidacy window to test. Every eligibility path requires a minimum of 48 months of RIC experience, with the required years of general construction/design experience on top of that scaling down as formal education goes up (a construction-management-related bachelor's or master's degree needs the least additional experience; no degree at all requires the most). Once earned, the credential has to be actively maintained too: recertification every 3 years requires 25 professional-development points tied to construction management, with at least one of those points specifically from a safety- or ethics-related activity, and no carryover between cycles.

The two-gate structure shows up in the cost too. A non-refundable application fee (less for CMAA members than non-members) pays for the experience review itself, separate from the exam fee you pay only once that application is approved, so a rejected or withdrawn application doesn't get refunded. Once you're cleared to test, the exam is delivered as a computer-based test, either at an in-person testing center or through live remote proctoring from home, the same flexibility PMI offers on the PMP and CAPM. The credential also carries a real, independently verified credibility marker beyond CMAA's own claims: it's accredited under ANSI's National Accreditation Board (ANAB) to the ISO/IEC 17024 standard, the international standard specifically for how personnel certification programs should be developed and governed, meaning a third party has audited CMAA's process, not just the exam content.

That recertification requirement isn't optional busywork, either: a CCM who lets a three-year cycle pass without the 25 required points can instead retake and pass the current exam, but doing so locks them into exam-based renewal going forward instead of the points-based path, a real trade-off rather than a free reset.

The practice questions below are original, written to test the same kind of construction-specific management judgment the real exam does across its 10 domains, not a copy of any real CMAA question. If you're earlier in a project-management track without the verified field experience the CCM requires yet, the PMP and CAPM are more general management credentials with lower or no experience bars, and How a Project Actually Closes Out walks through the kind of real project-lifecycle work (punch lists, closeout documentation, turnover) the CCM's Program & Project Management domain covers.

BreakGroundU is an independent study resource and is not affiliated with, endorsed by, or sponsored by Construction Management Association of America (CMAA). "Certified Construction Manager (CCM)" and any related names are trademarks of their respective owners, referenced here only so you can find the right exam to prepare for. Practice questions here are written independently and are not real exam content.

For official registration, pricing, and the real exam content outline, go straight to Construction Management Association of America (CMAA)'s own page.

Practice questions

Quick check: 1 of 15

Before you can even sit the CCM exam, what does CMAA require you to do?

Quick check: 2 of 15

What does CMAA mean by "Responsible-in-Charge" (RIC) experience?

Quick check: 3 of 15

How many months of RIC experience does CMAA require, at minimum, regardless of education background?

Quick check: 4 of 15

Which knowledge domain carries the most weight on the CCM exam?

Quick check: 5 of 15

Sustainability and Technology are each worth only 5% of the CCM exam, the smallest of its 10 domains. What does their inclusion at all tell you?

Quick check: 6 of 15

What's the CCM exam's actual structure: how many questions, and how much time do you get?

Quick check: 7 of 15

What passing score does CMAA require on the CCM exam?

Quick check: 8 of 15

How often does a CCM need to recertify, and what does that require?

Quick check: 9 of 15

What's the core difference between the CCM and the PMP, beyond one being construction-specific?

Quick check: 10 of 15

A change to the original contract scope comes up mid-project and needs to be priced, approved, and documented before the work proceeds. Which CCM knowledge domain does this fall under?

Quick check: 11 of 15

How is the cost of pursuing a CCM actually structured?

Quick check: 12 of 15

How is the CCM exam actually delivered once you're approved to test?

Quick check: 13 of 15

What does it mean that the CCM credential is accredited under ANSI/ANAB to the ISO/IEC 17024 standard?

Quick check: 14 of 15

If a CCM lets a renewal cycle pass without earning enough renewal points, what's the fallback option CMAA allows?

Quick check: 15 of 15

Within the CCM's 25-point recertification requirement, is any specific topic mandatory rather than open to any professional-development activity?

Reviewed 2026-09. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.

Credential in hand? Put it to work

Project & Operations

  1. 01 · GET HIRED GUIDE

    Know how hiring works

    Who actually hires, where they look, and what to have ready.

    Open →

  2. 02 · RESUME GUIDE

    Build the resume

    What a reviewer scans for, with bullets you can adapt.

    Open →

  3. 03 · INTERVIEW PREP

    Practice the conversation

    The questions to expect and what each one is really asking.

    Open →

  4. 04 · BLUEPRINT

    Put it on a calendar

    A dated, day-by-day plan built from all of the above.

    Build mine →