Architect
Technology & Design
Designs the building itself, translating an owner's program and budget into drawings a contractor can build from and a jurisdiction will permit, then stays involved through construction to answer for what was designed.

What is a Architect?
An Architect designs buildings: translating an owner's program, budget, and site into a design that satisfies building codes, zoning, and the client's intent, then producing the construction documents a contractor builds from. On most projects, architecture work starts well before a General Contractor is even hired, and the Architect's drawings are what a Project Engineer, Superintendent, and every trade on site ultimately build against. Unlike most careers on this site, architecture is a licensed profession: calling yourself an architect and stamping drawings for permit legally requires a state license.
What they do
- Develop a design concept that satisfies an owner's program, budget, and site constraints
- Produce construction documents (drawings and specifications) a contractor builds from
- Coordinate structural, mechanical, electrical, and civil engineering consultants into one cohesive design
- Navigate zoning, building code, and permitting requirements with the local jurisdiction
- Review submittals and respond to RFIs during construction to clarify design intent
- Visit the site during construction to confirm the work matches the design (contract administration)
A typical day
- 8:30 AMReview redlined floor plans from a junior designer before a client presentation
- 10:00 AMMeet with the structural and MEP engineering consultants to coordinate a ceiling conflict
- 12:00 PMWalk a site under construction to confirm an exterior detail matches the drawings
- 1:30 PMRespond to an RFI about a storefront detail that wasn't fully resolved in the drawings
- 3:00 PMRevise a floor plan after the owner requests a late program change
Skills
Software
Pay expectations
Pay for this role, nationally
as of May 2025
Source: U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics (OEWS), Architects, Except Landscape and Naval (SOC 17-1011), national data
Reviewed May 2025. Architect is typically reached through promotion or years of experience in a related role, not a day-one starting point, so this chart shows the pay range for people already working as a Architect rather than entry-level pay. "Lower range" is the lower part of the national wage distribution for this occupation, "typical" sits around the national median, and "top of scale" is the upper part, since pay isn't actually tracked by years on the job. Real pay varies a lot by state, metro area, union status, and employer, so scale these up or down for your market.
What this chart doesn't capture
Making Principal or opening your own firm means your income comes from the firm's fee revenue and the clients you personally bring in, not a salary line: real upside if the practice grows, but tied directly to the same slow, relationship-driven, boom-and-bust cycle that drives the fees themselves.
These figures are wage-and-salary pay only. The Bureau of Labor Statistics excludes principals' and partners' equity distributions from this survey, since that income isn't a wage, it's a share of the firm's own fee revenue. Architecture firm ownership stakes vary enormously by firm size, project type, and how much client relationship a principal personally controls, and no single published figure captures it meaningfully. Worth understanding a specific firm's partnership track and buy-in terms directly before counting on a number.
Education
- Required:
- A professional degree from a NAAB-accredited architecture program (a 5-year Bachelor of Architecture or a 2-3 year Master of Architecture after a non-accredited bachelor's), then the NCARB Architectural Experience Program (AXP), a structured record of supervised work experience, completed alongside or after the degree, then passing all divisions of the Architect Registration Examination (ARE). A state architecture license is legally required to stamp drawings submitted for permit.
- Not necessary:
- A background in construction trades; most architects come directly from an accredited design program
Training & Programs
NCARB Architectural Experience Program (AXP) is a real program that leads into this career.
Career progression
- 1.Design Professional / Architectural Intern
- 2.Architect
- 3.Project Architect or Associate
- 4.Principal or Partner
Who hires for this role
Going after Architect work?
Technology & Design
- 01 · GET HIRED GUIDE
Know how hiring works
Who actually hires, where they look, and what to have ready.
Open →
- 02 · RESUME GUIDE
Build the resume
What a reviewer scans for, with bullets you can adapt.
Open →
- 03 · INTERVIEW PREP
Practice the conversation
The questions to expect and what each one is really asking.
Open →
- 04 · BLUEPRINT
Put it on a calendar
A dated, day-by-day plan built from all of the above.
Build mine →
Explore next