Loss Control / Risk Engineer
Insurance & Claims
Inspects jobsites on the insurer's behalf to manage risk before a loss happens, distinct from a Safety Manager who does similar work but for the contractor, not the insurance company.
What is a Loss Control / Risk Engineer?
A Loss Control Engineer, also called a Risk Engineer, inspects construction sites and facilities on behalf of an insurance company or broker, identifying hazards and risk factors that could lead to a claim and recommending changes to reduce that risk. It sounds similar to a Safety Manager's job, and the underlying hazard knowledge overlaps, but the two roles sit on opposite sides of the relationship: a Safety Manager works for the contractor building the project, while a Loss Control Engineer works for (or on behalf of) the insurer that's covering it, and their inspection findings can directly affect a project's insurance pricing and terms.
What they do
- Inspect construction sites and facilities to identify hazards and risk factors
- Write loss control reports documenting findings and recommended corrective actions
- Advise underwriters on a project or contractor's risk profile based on site inspections
- Track a contractor's safety performance and loss history over time
- Recommend risk improvement measures to policyholders as a condition of coverage
- Investigate the circumstances behind significant claims to identify prevention opportunities
A typical day
- 8:00 AMReview a contractor's safety records ahead of a scheduled site inspection
- 9:30 AMInspect an active jobsite, documenting hazards and safety program adherence
- 12:00 PMWrite up a loss control report with recommended corrective actions
- 1:30 PMAdvise an underwriter on a contractor's risk profile ahead of a policy renewal
- 3:00 PMFollow up with a policyholder on whether previously recommended safety improvements were made
Skills
Software
Education
- Required:
- Bachelor's degree in occupational safety, engineering, or a related field, plus safety or risk-related field experience; no license is legally required for this role
- Preferred:
- Board of Certified Safety Professionals' Certified Safety Professional (CSP) credential, the same designation many contractor Safety Managers pursue, and the Associate in Risk Management (ARM) designation from The Institutes
- Not necessary:
- A construction-specific degree; many loss control engineers come from a general safety or engineering background
Career progression
- 1.Loss Control Field Representative
- 2.Loss Control / Risk Engineer
- 3.Senior Risk Engineer
- 4.Risk Engineering Manager