Skip to main content
Concept

Toilet Partitions

CSI Division 10, Specialties

The stall dividers and doors in a public or commercial restroom, manufactured in several material types, plastic laminate, solid plastic, powder-coated metal, or stainless steel, each with different cost, moisture resistance, and durability tradeoffs, and mounted in one of several configurations, floor-mounted, ceiling-hung, or floor-to-ceiling, that each affect installation sequencing.

Why it matters

Material and mounting choice affects both long-term maintenance cost and installation sequence: floor-to-ceiling mounting in particular requires precise floor layout coordination with the finish flooring installer before anchors go in.

On a real project

A school district specifies solid plastic partitions, floor-mounted, for a new building's restrooms, chosen for moisture resistance and lower long-term maintenance over the powder-coated metal typically used in the district's office buildings.

Who this matters most to

A Carpenter or specialty installer sets and anchors the partitions, coordinating layout with whoever installs the finish flooring.

Where this goes wrong

An installer sets floor-mounted partition anchors before the finish flooring installer lays out the tile pattern. The anchor bolts end up landing mid-tile instead of on a grout line, forcing the tile installer to cut awkwardly around each one.