Assignar
Workforce management
Workforce and equipment scheduling software built for contractors juggling crews and machines across several active jobsites at once, common in heavy civil and infrastructure work.
What it does
Assignar centers on the dispatch board: a scheduler drags and drops crew members and pieces of equipment onto specific jobs for the day or week, seeing at a glance who and what is already booked elsewhere before double-booking a crew or a piece of equipment two projects need at once. Digital timesheets and equipment usage logs tie back to the same schedule, and compliance data, certifications, licenses, equipment inspections, flags automatically if someone or something gets assigned to a job they're not actually qualified or certified for.
Key features
- A drag-and-drop dispatch board for scheduling crews and equipment across multiple active jobsites
- Digital timesheets and equipment usage logs tied to the day's schedule
- Certification and compliance tracking that flags a worker or machine scheduled onto a job they're not qualified for
- Real-time visibility into who and what equipment is already committed elsewhere before a new assignment is made
How it's actually used
- A scheduler assigns three excavator crews across two active sites for the coming week without double-booking a single operator
- A general superintendent gets flagged that a worker scheduled for a confined-space task doesn't have the required certification on file
Assignar Tutorial
Good to know
- Pricing:
- Subscription-based, typically priced per user; contact Assignar for current pricing.
- Website:
- https://www.assignar.com
Reviewed 2026-11. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.
Explore next