Skip to main content
Software

AutoSPRINK

MEP design & estimating

Fire sprinkler system design software, built to lay out piping, run hydraulic calculations, and check a sprinkler design against NFPA code requirements before it's ever installed.

What it does

AutoSPRINK centers on the sprinkler layout: a designer places piping, heads, and risers on a 3D model of the building, and the software runs the hydraulic calculations (flow and pressure through every pipe and fitting) that prove the system will actually deliver the water a fire requires under NFPA 13. Material lists and fabrication drawings generate directly from that same model, and clash detection against other MEP trades' models catches a sprinkler pipe routed through a duct or beam before it becomes a field conflict.

Key features

  • 3D sprinkler system layout and piping design
  • Automated hydraulic calculations proving a design meets NFPA flow and pressure requirements
  • Material lists and fabrication drawings generated directly from the design model
  • Clash detection against other MEP trades' models

How it's actually used

  • A fire protection designer runs a hydraulic calculation to confirm a sprinkler system will deliver required flow at the building's highest, most remote head
  • A sprinkler fitter uses a fabrication drawing generated from the design model to prefabricate pipe sections before installation

AutoSPRINK Tutorial

Good to know

Pricing:
Licensed software, sold per seat; contact the vendor (M.E.P. CAD) for current pricing.

Reviewed 2026-11. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.