BuildingConnected
Bid management
A bid management platform, built by Autodesk, where a general contractor invites subcontractors to bid, collects and compares those bids, and keeps a database of vetted subs to invite again next time.
What it does
BuildingConnected centers on the invitation-to-award cycle: a preconstruction team builds a bid package, invites subcontractors from a searchable network or their own private directory, and tracks who has viewed, downloaded, and responded to the invite. Incoming bids land in a single bid-leveling view so an estimator can compare scope, price, and exclusions side by side instead of juggling separate emails and spreadsheets, and a subcontractor's insurance, licensing, and past-performance data travels with their profile for prequalification.
Key features
- Subcontractor invitation and bid tracking, including read receipts on who has opened and responded to a bid package
- Bid leveling that lines up multiple subs' pricing, scope, and exclusions in one comparison view
- A searchable network of subcontractors plus a private, firm-specific directory of preferred subs
- Subcontractor prequalification data (insurance, licensing, past performance) attached to each sub's profile
How it's actually used
- An estimator sends a bid invitation to a dozen electrical subs at once and tracks which ones have actually opened the drawings
- A preconstruction team levels five incoming masonry bids side by side to spot which one left out a scope item the others included
BuildingConnected Tutorial
Good to know
- Pricing:
- Free for subcontractors; general contractors pay a subscription, often bundled with other Autodesk Construction Cloud products.
- Website:
- https://www.buildingconnected.com
Reviewed 2026-11. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.