DroneDeploy
Reality capture
Drone-based mapping and progress-tracking software, built for flying a jobsite or earthwork site on a schedule and turning the footage into measurable maps and volumes, rather than just photos.
What it does
DroneDeploy plans and automates a drone's flight path over a site, then stitches the resulting images into an orthomosaic map and a 3D model a superintendent or surveyor can measure directly, distances, areas, and earthwork volumes, without ever walking the site with a tape measure. Flying the same flight path on a regular schedule turns those maps into a visual timeline of how a site has changed, letting a project team compare this week's progress photo against last week's or against the original design surface.
Key features
- Automated drone flight planning that repeats the same flight path on a schedule for consistent progress comparisons
- Orthomosaic mapping and 3D model generation from drone imagery
- Volumetric measurement for stockpiles and earthwork cut/fill
- Side-by-side progress comparison between flights over time
How it's actually used
- A surveyor measures a stockpile's volume from a drone flight instead of a manual ground survey
- A general superintendent compares this month's aerial map of the site against last month's to show progress at an owner meeting
DroneDeploy Tutorial
Good to know
- Pricing:
- Subscription-based, priced per user or per site/acreage flown.
- Website:
- https://www.dronedeploy.com
Reviewed 2026-11. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.