Skip to main content
Software

FastPIPE & FastDUCT

MEP design & estimating

Paired mechanical estimating and design software for piping and ductwork, FastPIPE for plumbing and process piping, FastDUCT for HVAC ductwork, used by MEP estimators to take off and price mechanical scope.

What it does

FastPIPE and FastDUCT work from a digital plan set the same way a general takeoff tool does, but with mechanical-specific material and labor databases built in: an MEP estimator traces pipe or duct runs on screen and the software immediately prices fittings, valves, insulation, and labor hours against those databases rather than an estimator pricing each component by hand. Finished takeoffs export into a bid or, on the design side, into fabrication-ready drawings that a mechanical or sheet metal shop can build directly from.

Key features

  • Digital takeoff for piping and ductwork directly off a plan set
  • Built-in mechanical material and labor cost databases for pricing fittings, valves, insulation, and labor hours
  • Separate modules for piping (FastPIPE) and ductwork (FastDUCT) that share the same takeoff workflow
  • Export to fabrication-ready drawings for a mechanical or sheet metal shop

How it's actually used

  • An MEP estimator takes off a building's ductwork runs and gets an automatic material and labor price using the software's built-in cost database
  • A mechanical contractor's estimating team prices a plumbing bid's piping scope using FastPIPE's fitting and valve database instead of pricing each component by hand

FastPIPE & FastDUCT Tutorial

Good to know

Pricing:
Licensed software, sold per seat, often as a combined FastPIPE and FastDUCT bundle; contact the vendor for current pricing.

Reviewed 2026-11. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.

Explore next