hardhatU
Software
Premium

Matterport

Reality capture

A 3D scanning platform that turns a physical space into a photorealistic, walkable digital model, used in construction mainly for documenting existing conditions and finished work.

What it does

Matterport's camera scans a real space and stitches the result into a photorealistic digital twin someone can walk through remotely, closer to a real visit than a set of photos. In construction, that's most useful for documenting existing conditions before a renovation or finished work before it gets covered by later trades, and the underlying point cloud data can feed into a BIM model for existing conditions modeling. The camera itself is a real upfront cost, which is worth weighing against how often a company would actually use it.

Key features

  • 3D scanning that produces a photorealistic, walkable digital twin of a physical space
  • As-built documentation of a finished space before it gets covered by later work or handed over to the owner
  • Point cloud data that can feed into a BIM model for existing conditions modeling
  • Hardware and software sold together, with the camera itself a significant upfront cost

How it's actually used

  • A BIM/VDC Specialist scans a building's existing conditions before a renovation so the design team is working from an accurate model instead of outdated drawings
  • A facilities manager scans a finished space at turnover so a future maintenance question can be answered by walking the digital model instead of visiting in person

Tutorials

Tutorial videos for this tool are coming soon.

Good to know

Pricing:
A significant upfront hardware cost for the scanning camera, plus a recurring subscription priced by how many active scanned spaces are in use at once.

Reviewed 2026-09. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.