Samsara
Equipment & fleet management
Connected-equipment and fleet telematics software, tracking the location, usage, and condition of trucks and heavy equipment through GPS sensors installed on each machine.
What it does
Samsara centers on the sensor data a GPS tracker reports from each piece of equipment or vehicle: location, hours of use, fuel level, and diagnostic codes that flag a mechanical problem before it becomes a breakdown in the field. An equipment or fleet manager sees a whole fleet's locations and status on one dashboard, sets up automatic maintenance alerts based on actual engine hours rather than a calendar guess, and can geofence a jobsite to get an alert if a piece of equipment leaves it unexpectedly.
Key features
- Real-time GPS location and status tracking across an entire equipment and vehicle fleet
- Engine diagnostics and maintenance alerts triggered by actual usage (engine hours, fuel level) rather than a fixed calendar schedule
- Geofencing that flags when a piece of equipment leaves a defined jobsite boundary
- Dashcam and driver-safety monitoring options alongside the core equipment tracking
How it's actually used
- An equipment manager gets an automatic alert that an excavator is due for scheduled maintenance based on its actual logged engine hours
- A fleet manager gets notified the moment a piece of equipment leaves a jobsite's geofenced boundary overnight
Samsara Tutorial
Good to know
- Pricing:
- Subscription-based per vehicle/asset, plus the cost of the GPS hardware installed on each piece of equipment.
- Website:
- https://www.samsara.com
Reviewed 2026-11. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.
Explore next