Trimble Earthworks

Surveying & machine control

In-cab GPS machine control software that guides a dozer's, excavator's, or grader's blade or bucket to a 3D design surface in real time, instead of an operator working off grade stakes.

What it does

Trimble Earthworks runs on a display mounted in the equipment cab: a 3D design surface, built from a civil engineer's or surveyor's design file, shows on screen as a target grade, and GPS positioning on the machine tells the operator in real time how far the blade or bucket is from that target. On equipment with full automatics, the system can control the blade or bucket directly rather than just displaying guidance, cutting and filling to the design surface without an operator manually chasing a number on a screen.

Key features

  • Real-time 3D grade guidance in the equipment cab, referenced to a GPS-positioned design surface
  • Automatic blade/bucket control on equipped machines, cutting and filling to a design surface without manual adjustment
  • Design file import directly from civil engineering software like Civil 3D
  • Cut/fill and progress reporting that tracks earthwork completed against the design

How it's actually used

  • A dozer operator grades a pad to final subgrade using in-cab GPS guidance instead of checking grade stakes by hand
  • A heavy civil estimator compares earthwork actually moved against the design surface to see how a job is tracking against the bid

Trimble Earthworks Tutorial

Good to know

Pricing:
Sold as part of a Trimble machine control hardware/software package; contact a Trimble dealer for current pricing.

Reviewed 2026-11. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.