Skip to main content
Software

Xactimate

Insurance & Restoration

The estimating software the property insurance industry has largely standardized on for pricing repair work after a claim, made by Verisk's Xactware division.

What it does

Xactimate lets an adjuster, restoration contractor, or public adjuster sketch a damaged structure's layout, measure the areas affected, and price the repair using a shared, regionally localized line-item price list. Because nearly every party to a claim references the same underlying price list, a dispute over an estimate usually comes down to specific line items rather than two completely incompatible formats. A field visit can start an estimate on a tablet or phone, with the same file finished later back at a desk, so the office and field sides of the work stay in one record instead of two.

Key features

  • 2D and 3D sketching tools for drawing a damaged structure's layout from field measurements
  • A standardized, regionally priced line-item database that every party to a claim can reference against
  • Mobile capture in the field with the estimate finished later on desktop, so a site visit doesn't require carrying a laptop
  • Photo documentation attached directly to specific line items in the finished estimate

How it's actually used

  • An insurance adjuster sketches a water-damaged room's dimensions on a tablet during an inspection and finishes pricing the repair later from the same file
  • A restoration contractor and an adjuster compare two independently written estimates for the same loss line item by line item to negotiate their specific disagreements

Xactimate Tutorial

Good to know

Pricing:
Subscription-based, sold in monthly, six-month, and annual terms for the full professional edition, with a lower-cost standard edition available for single-platform access only.

Reviewed 2026-09. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.