Skip to main content
Concept

Grid Resynchronization

The process of safely reconnecting a building's electrical system, after it's been running on a microgrid or generator during a utility outage, back to the returning utility power, which requires matching the microgrid's voltage phase and frequency to the grid's before the connection closes.

Why it matters

Reconnecting two live power sources that aren't synchronized can cause serious equipment damage or a dangerous electrical event, since the two sources would effectively be fighting each other the instant they're connected. Automated controls handle this matching in a modern system, but understanding why the process exists explains why a microgrid can't simply flip back to grid power the instant utility service is restored.

On a real project

When utility power is restored after an outage, a building's microgrid controller first matches its own voltage phase and frequency precisely to the returning grid power before closing the connection, rather than reconnecting immediately and risking a damaging mismatch.

Who this matters most to

A Renewable Energy Project Manager oversees the controls that manage grid resynchronization as part of a microgrid or battery storage system's design.

Where this goes wrong

A poorly configured microgrid controller reconnects to the returning utility grid before fully matching phase and frequency. The mismatch creates a surge that damages sensitive equipment connected to the system at the moment of reconnection.