Skip to main content
Concept

NPDES Construction General Permit

A Clean Water Act permit required for any construction activity disturbing one acre or more of land, or a smaller site that's part of a larger common plan of development that will ultimately disturb an acre or more, requiring a stormwater pollution prevention plan and erosion/sediment controls in place before any ground disturbance begins.

Why it matters

The "common plan of development" rule means several small, individually under-an-acre lots inside one larger development can still require permit coverage together, even though no single lot would trigger it on its own.

On a real project

A developer building six half-acre residential lots inside a ten-acre subdivision needs NPDES permit coverage for the whole development, even though each individual lot disturbs less than an acre by itself.

Who this matters most to

A Civil Engineer designs the erosion and sediment control plan the permit requires before a single acre of ground gets disturbed.

Where this goes wrong

A general contractor starts clearing and grading a three-acre site before the NPDES permit and its required stormwater controls are actually in place. A state inspector cites the project for an unpermitted discharge, and work stops until the paperwork and controls catch up to where the grading already is.