Skip to main content
Concept

Wall Coverings

CSI Division 09, Finishes

Non-paint wall finishes applied as a covering rather than a coating, vinyl wallcovering, wallpaper, fabric-wrapped panels, and acoustic wall coverings, each rated for a specific level of durability and cleanability and, on many commercial projects, required to meet a minimum flame spread rating under the building's interior finish requirements.

Why it matters

Commercial wall coverings, unlike residential wallpaper, have to meet Class A flame spread ratings in most occupancies, a requirement that's easy to overlook if a design team specifies a covering based purely on appearance without checking its fire rating for the specific occupancy it's going into.

On a real project

A hospital corridor's vinyl wall covering is selected specifically because it carries a Class A flame spread rating and a documented antimicrobial, cleanable surface, requirements a decorative residential-grade wallpaper wouldn't meet.

Who this matters most to

A Drywall Installer or specialty wallcovering installer applies commercial wall coverings, working from a substrate that's typically finished to a higher gypsum board finish level than paint alone would require.

Where this goes wrong

A design team selects a fabric wall covering for a corridor based on color and texture without confirming its flame spread rating meets the occupancy's requirement. The mistake isn't caught until the fire marshal reviews finish material submittals during permitting, forcing a late substitution that delays the finish schedule.