Skip to main content
Software

Civil 3D

Design & BIM

Autodesk's civil engineering design software, built for site design, grading, roadways, and underground utilities, rather than the general-purpose drafting AutoCAD is built for.

What it does

Civil 3D works from a dynamic model instead of static lines: a surveyor's point data builds an existing-ground surface, a civil engineer lays out roadway corridors and grading plans against that surface, and the model recalculates cut-and-fill volumes and contours automatically every time a design changes rather than requiring a manual redraw. Pipe networks for storm and sanitary utilities carry their own slope and invert-elevation data, and the finished design exports to the GPS coordinates a machine-control system or a surveyor's stakeout equipment uses in the field.

Key features

  • Dynamic surface modeling from survey point data, with automatic cut-and-fill volume and contour updates when the design changes
  • Roadway corridor and grading design tools for site and civil projects
  • Pipe network design for storm and sanitary utilities, with slope and invert elevation data built in
  • Data export to the GPS coordinates used by machine control systems and surveying equipment in the field

How it's actually used

  • A civil engineer models a parking lot's grading plan and gets an automatic cut-and-fill volume estimate before construction starts
  • A surveyor exports a finished site design's point data directly to a GPS machine control system running on a dozer or excavator

Civil 3D Tutorial

Good to know

Pricing:
Subscription-based through Autodesk, sold standalone or bundled into the AEC Collection with Revit, AutoCAD, and Navisworks.

Reviewed 2026-11. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.