Skip to main content
Software

Raken

Field management

A mobile app for daily field reports, jobsite photos, and crew time tracking, built so a foreman or superintendent can log a day's work from a phone rather than filling out paper forms at the end of a shift.

What it does

Raken centers on the daily report: a superintendent logs weather, manpower, work completed, and safety notes from a phone or tablet, attaches jobsite photos directly to that day's entry, and the report generates automatically as a shareable PDF instead of being typed up separately later. Crew time tracking runs alongside the same daily log, so hours worked tie back to the same day's report rather than living in a separate timecard system, and completed reports roll up across a whole company's projects for an office team to review without chasing down paper forms.

Key features

  • Daily field reports (weather, manpower, work completed, safety notes) logged from a phone and auto-generated as a shareable PDF
  • Jobsite photo documentation attached directly to the day's report
  • Crew time tracking and digital timecards tied to the same daily log
  • Company-wide reporting that rolls up every project's daily reports for the office to review

How it's actually used

  • A superintendent closes out the day by logging manpower, weather, and a few jobsite photos from their phone before leaving the site
  • An owner's rep reviews a week of daily reports and photos remotely instead of requesting a written weekly progress summary

Raken Tutorial

Good to know

Pricing:
Subscription-based, typically priced per user per month.

Reviewed 2026-11. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.