Skip to main content
Software

RISA

Structural engineering

Structural analysis and design software, used by structural engineers to model a building's structural frame and check whether every beam, column, and connection can actually carry its loads.

What it does

RISA's products (RISA-3D for general structural analysis, plus companion tools like RISAFloor and RISAFoundation) let a structural engineer build a model of a building's frame, apply the loads it has to carry (gravity, wind, seismic), and run the analysis that checks every member against the relevant building code and material design standard. Instead of hand-calculating each beam and column, the engineer gets a code-check result across the whole structure at once, and the model updates automatically when a design changes, so a resized beam or an added column gets re-checked rather than requiring every calculation to be redone from scratch.

Key features

  • 3D structural modeling of a building's full frame (RISA-3D)
  • Automated load application (gravity, wind, seismic) and code checking against relevant building and material standards
  • Companion modules for floor systems (RISAFloor) and foundation design (RISAFoundation)
  • Automatic re-analysis when a design changes, instead of requiring every calculation to be redone by hand

How it's actually used

  • A structural engineer models a building's steel frame and gets an automatic code check on every beam and column against the governing design standard
  • An engineer resizes a single overloaded beam and the model automatically re-checks every connected member rather than requiring a full manual recalculation

RISA Tutorial

Good to know

Pricing:
Licensed software, sold per seat or by subscription; contact RISA for current pricing.

Reviewed 2026-11. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.