Site design and construction practices that reduce a project's environmental impact outside the building itself (managing stormwater naturally, minimizing disturbed area, protecting existing vegetation, and choosing paving and landscaping that reduce heat and runoff), as distinct from the building's own energy or materials performance.

Why it matters

A highly efficient building on a site that generates excessive stormwater runoff or destroys existing natural drainage still creates real environmental impact: several green building certification systems specifically award credits for site practices separately from building performance, because the two aren't the same problem.

On a real project

Instead of a conventional paved parking lot, a project uses permeable paving and bioswales to let stormwater filter naturally into the ground on site, reducing the volume of runoff the surrounding municipal storm system has to handle during heavy rain.

Who this matters most to

An Environmental/Remediation Specialist is often involved early in site planning to identify environmentally sensitive areas worth protecting or working around. A Sustainability/LEED Consultant tracks site-specific credits (reduced disturbed area, stormwater management, reflective paving) as part of the project's overall certification strategy.

Where this goes wrong

A project clears more of a site than the design actually requires, assuming extra cleared area simplifies construction logistics. The additional disturbed area increases stormwater runoff beyond what the site's drainage design accounted for, and the project has to add stormwater management measures after the fact that a smaller initial footprint would have avoided.