Skip to main content
Software

HammerTech

Safety

A safety and compliance platform built specifically for construction, covering worker orientations, permits, and inspections in one system rather than several disconnected tools.

What it does

HammerTech centers on getting a worker's orientation and safety assessment done digitally, often before they ever set foot on site, then keeps permits, safety data sheets, and their expiration dates in one tracked place instead of a filing cabinet. Safety inspections and audits log against a project's own compliance requirements, and incident reports tie back to the same worker and site records the rest of the platform already has on file.

Key features

  • Digital worker orientations and inductions that can be completed before someone ever steps on site
  • Centralized permit tracking, including hot work permits, plus safety data sheet storage with expiration alerts
  • Safety inspections and audits logged against a project's own compliance requirements
  • Incident reporting tied to the same worker and site records the rest of the platform already tracks

How it's actually used

  • A new worker completes a digital site orientation and safety assessment from home before their first day on a jobsite
  • A safety manager gets an automatic alert before a subcontractor's insurance certificate or safety data sheet expires, instead of discovering it lapsed after the fact

HammerTech Tutorial

Good to know

Pricing:
Custom quote through HammerTech's sales team rather than published pricing.

Reviewed 2026-09. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.