Mitti (formerly SafetyCulture)
Safety
A mobile-first inspection and checklist platform that construction safety teams use to run digital jobsite inspections, log hazards, and track corrective actions, known as SafetyCulture and its iAuditor app before an August 2026 rebrand to Mitti.
What it does
Mitti replaces a paper clipboard inspection with a digital checklist that a safety manager builds once and reuses across every site or crew. A worker running an inspection in the field can attach a photo directly to the specific item it concerns, and a flagged hazard gets tracked as an open corrective action until someone actually closes it out, rather than sitting on a completed form that never gets revisited. The app keeps working without a signal on a remote jobsite and syncs everything once a connection is available again.
Key features
- Customizable digital checklists and inspection templates, built once and reused across every site or crew
- A mobile app that works offline in the field and syncs once a connection is available
- Photo and note capture attached directly to a specific checklist item, not just a separate report
- Corrective action tracking that follows a flagged hazard until it's actually closed out
How it's actually used
- A safety manager builds a digital jobsite hazard inspection checklist once and has every superintendent on the company's projects run the same inspection every week
- A worker photographs a damaged piece of scaffolding directly inside the inspection app, and the flagged item stays open and assigned until someone confirms it's fixed
Tutorials
Tutorial videos for this tool are coming soon.
Good to know
- Pricing:
- Freemium, with a free tier for small teams and paid tiers unlocking deeper analytics, integrations, and unlimited team size.
- Website:
- https://mitti.com/
Reviewed 2026-09. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.