Skip to main content
Software

Fieldwire

Field management

A jobsite-focused plan and task management app, owned by Hilti, built around keeping field crews and the office working off the same live set of plans, tasks, and punch lists.

What it does

Fieldwire keeps a plan set, the tasks tied to it, and the punch list that closes a project out all in one mobile-friendly view. A task or punch item gets pinned to its exact location on the drawing rather than described in a separate list, so a crew opening the app on site sees exactly where a problem is instead of just reading about it. It's positioned as a lighter, more affordable alternative to a full platform like Procore or Autodesk Build, aimed at contractors who mainly need field task and plan coordination rather than the deeper budget and document control modules those bigger platforms include.

Key features

  • Plan viewing and markup with every task, photo, and punch item pinned to its exact location on the drawing
  • Task assignment and tracking, so a foreman can see who owns what and by when across the whole crew
  • Punch list creation and closeout tracking tied directly to a specific spot on the plan
  • A free tier for small teams, with paid tiers adding RFI tracking, submittals, and deeper reporting

How it's actually used

  • A foreman assigns a punch list item to a specific subcontractor directly on the floor plan, and the item stays open until that sub marks it complete and attaches a photo
  • A superintendent tracks dozens of open tasks across several trades on one plan view instead of juggling separate paper lists per trade

Fieldwire Tutorial

Good to know

Pricing:
Tiered, per user per month, with a free tier limited by project and sheet count and three paid tiers that add RFI tracking, submittals, and deeper reporting as you move up.

Reviewed 2026-09. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.